NO GAP Progetti
NO GAP Abroad
 
 

TERMAL - 1998

The complex which was finished in 1999 consists of approx. 9800sq.m of floor area and rises to a maximum height of 37m.

 The building is essentially composed of three interconnected parts:

-Block A: A prefabbricated building using  in part traditional  storage methods and in part a completely automated and computerized storage system. On the roof is located parking areas, green spaces and outdoor recreative areas.

-Block B: A stepped building containing principally offices.

-Block C: A building for office use containing circular ramp for vehicular access to roof.

 
ND web design